- Increasing distribution storage capacity through the rehabilitation of existing castles, the construction of new castles on the same site as the existing one and the addition of new treated water tanks.
- Densification of the distribution network and renewal of obsolete pipes and hydromechanical equipment.
Our Services :
- Studies of infrastructure for the mobilization, treatment and distribution of drinking water in urban and rural areas
- Sanitation infrastructure and treatment plant
Our References :
- Feasibility studies of four (04) drinking water supply systems in certain localities in Cameroon in the Central and Southern regions.
- Carrying out drinking water supply works in certain municipalities in the far north and north-west of Cameroon (2012)
- Financing and Execution of Detailed Studies (Feasibility Studies, APS, APD, ESIA, Geotechnical; Economic) already approved by MINEPAT and CAMWATER for the design, construction and rehabilitation project of drinking water supply systems in 20 cities in Cameroon following the signing of a commercial contract with our partner WPIL Ltd India for 74 billion FCFA (2020)
Signature of commercial contract for the Reconfiguration of the drinking water distribution networks in the city of Yaoundé between the President of WPIL Ltd India and the CEO of CAMWATER 2022 (For the extension of the tertiary network in the city of Yaoundé, the linear network tertiary to be installed approximately 348 km).